USmetros
Metropolitan Community Pages
 Software/QA/DBA
   Post a free classified
   Search              State   All States
USmetros > Software/QA/DBA > New Jersey > Quality Assurance Analyst (QA Tester)


Quality Assurance Analyst (QA Tester)


Posted on Mon, 15 Dec 17:10 EDT
Reply to: tech.training08@gmail.com

[Manage this Ad][Visits][Print this ad] 

Week 1:
 
Manual Testing
 
Software development Life cycle (SDLC)
Software QA and
 Software testing.
Capability Maturity Model.
Manual and Automation testing.
1.	Manual testing process (Pros and Cons)
2.	Automation testing process (Pros and Cons)
3.	Manual Testing vs. Automation Testing
Major steps involved in testing process (QA life cycle).
Entrance and exit criteria in QA.
Documentation in QA process.
Business Requirement Document (BRD) and System Requirement Specification (SRS)
Creating Test Cases, Test Plans and Test Scripts.
Testing scenarios.
Traceability Matrix.
Prioritize the testing process.
Web Application Testing, GUI Testing .
Test Management and Reporting.
Defects and Defect Tracking system.
 
Types of Testing
Most commonly followed
•	Unit testing
•	Smoke test
•	Black box testing
•	Integration testing
•	Regression testing
•	Performance testing
•	UAT
 
•



 Other Testing types
•	Adhoc testing
•	White box test
•	Security testing
•	Compatibility testing
•	Boundary testing
•	Stress and Load testing
•	Alpha and Beta Testing
•	Compliance testing
•	Mutation testing
•	System testing
•	Operation readiness testing
•	Fail over
Testing
 
 
Week 2:
 

Defect Tracking Tools - Quality Center / Test Director 
•	Bug Life cycle
•	Severity of the bug
•	Defect tracking Process
•	Various Defect Tracking Tools.
 Test Director and Quality Center
• Adding Test Requirements
1.	Create Test Cases
2.	Executing the test cases manually
3.	Parameterize the test cases
• Creating a Test case Template
1.	Creating a Test set 
2.	Executing a Test set
3.	Run Tests and Analyze Results
4.	Report and Trace Defects
5.	Document Generator
 
Week 3: (continues in to 4)
 
Quick Test Professional
Introduction to QuickTest
Test Planning
Record and Playback
How QuickTest identifies objects
Object types (Test Object, Run time Object)
Object Repository
1.	Shared Object Repository
2.	Local Object Repository
3.	Object Spy
4.	Data Table
5.	Local Data table
6.	Global Data table
7.	Synchronizing Tests
8.	Break Points
Types of Actions
Creating Tests with Multiple Actions
Data Driven Tests
Working with the Data Table
 
Advanced QTP
 
Checkpoints
VB Scripting Basic Statements
Report Event
Output and Correlation
Alternatives to Standard Recording
Recovery Manager and Scenarios
Saving QuickTest Tests into Test Director
Using the Expert View (Preview)
User-Defined Functions
Test automation frame work -Introduction and types
 
Week 4:
Load runner , Mobile testing and Database validations

Load runner

• Record with the Virtual User Generator (VUgen)
• Invoke the client application from VuGen 
• Load Runner transaction measuring statements
• Add checkpoints 
• Check playback results
• Parameters
• Verify execution
• Correlation 
 1. Manual correlation

2. Automated correlation 
 Load Runner Scenarios (Controller)
• Define and connect to load generators 
• Define Vusers and scripts
• Add and configure performance monitors
• Modify options and run-time settings for specific
purposes 
• Analyzing Scenario Execution (Analyzer)

Mobile Applications 

•	Native Applications
•	Hybrid Applications 
•	Usability testing 
•	Perfecto Mobile 

Database testing basic concepts 
 


Reply to this posting

Name
Email
Title
Reply

               

 

Email this posting to a friend

Name
Email
Friend's Email
Comment

 
About | Terms of service | Privacy policy | Report problem
Copyright © 2003-2016 USmetros.com